Well, the brew stand is finally complete, right down to the wheels and last coat of sealer. To be honest, this took me much longer than I wanted. I am very happy with the design and wasted almost no wood at all, but it took many evenings of cutting, attaching, and thinking. I will leave this outside under an overhang so I am curious to see how it holds up under exposure to sunlight in the summer and cooler/wetter conditions in the Fall and Winter.

At the very least, I now have a mobile, safe station for brewing. And by taking my time the measurements fit my equipment. It isn't any taller than it has to be but it still drains from HLT to Mash Tun to Boil Kettle right into the fermenter.

No more brewing on chairs and tables and the ground! For a price list and more photos check out the projects tab